WHAT WE DID
About the project
Aldridge Air Conditioning was engaged to design and install a comprehensive air conditioning system for the Project Mandolin in Peterborough. This project involved the installation of Daikin and Mitsubishi air conditioning systems to ensure efficient and reliable climate control across the facility.
Premium Equipment: Utilised high-quality Daikin and Mitsubishi air conditioning systems, with Aldridge Air Conditioning being a Daikin D1+ Partner. All equipment came with a 7-year manufacturer’s parts warranty.
Advanced Control Systems: Implemented state-of-the-art centralised control systems for efficient management of the air conditioning units.
Complete Service: Provided a thorough service from installation to commissioning, ensuring all systems were fully operational and optimised.
HOW WE HELPED
Services provided
Supplied and installed 47 Fan Coil Units (FCUs) on four Daikin VRV heat recovery systems serving the ground and first floor office areas.
Mounted condensing units on anti-vibration feet.
Supplied and installed four FCUs on one Daikin VRV heat recovery system serving the maintenance shop, tool holding room, and storage room.
Supplied and installed two Daikin FCUs on one Daikin twin split system serving the server room, running as N+1.
Supplied and installed four Daikin split systems serving the LV switchrooms.
Installed refrigeration pipework, Class ‘0’ insulation, and PVC gravity drains to local drain stack via waterless trap.
Fitted pumps with hoses to local drain stack where gravity drains were not possible.
Supplied and installed wall-mounted controllers for each room, linked to a centralised controller (C/W DCS302 adaptor) for external On/Off and wiring of all interconnecting units.
Installed 9 Daikin cassette FCUs in the stores, sprayed black as per client’s request to reduce costs.
Supplied and installed 4 Mitsubishi Close Control Units, including condensing units (NEXT MTRPRECISE + DX Close Control Units), along with necessary pipework and commissioning.
Conducted pressure testing, evacuation, charging of refrigerant circuits, and commissioning of systems.