WHAT WE DID
About the project
Aldridge Air Conditioning was engaged to design and install a comprehensive air conditioning system for the STHIL facility in Camberley. This project involved the installation of Mitsubishi air conditioning systems, including various components to ensure efficient and reliable climate control across the facility.
Premium Equipment: Utilized high-quality Mitsubishi air conditioning systems, with Aldridge Air Conditioning being a Mitsubishi Business Solutions Partner. All equipment came with a 7-year manufacturer’s parts warranty.
Comprehensive Control: Implemented advanced centralized control systems for efficient management of the air conditioning units.
Complete Service: Provided a thorough service from installation to commissioning, ensuring all systems were fully operational and optimized.
HOW WE HELPED
Services provided
Installed 36 Mitsubishi Fan Coil Units (FCUs) on the ground floor, including pipework and cables from FCUs to BC boxes.
Pressure tested all three systems and commissioned them, including the required refrigerant.
Supplied and installed 30 local remote controllers, including cable and labor for the ground floor.
Installed 10 new FCUs, along with pipework and cables, assuming existing cable tray installation.
Pressure tested and commissioned both systems, including the required refrigerant.
Installed Big Foot frames for support.
Installed and pressure tested two systems, validating wiring and testing condensate drains.
Commissioned both systems, including refrigerant gas.
Completed pipework installation from BC boxes to condensing units.
Supplied and installed five Mitsubishi BC boxes on the first and ground floors.
Supplied and installed AE200 centralized controller, EW50, and two BACnet pin codes for open protocol BMS integration.
Supplied and installed four split systems, including existing condensing units and four new PKA-M100KA wall-mounted FCUs with condensate pumps.